Home | Services | Safety | Links | Contact
Surface Casing Vent Testing Back to Services

90 days after a new well is drilled it is a requirement to perform a leak test.  If it fails, measuring the gas flow and pressure buildup within the surface casing can determine if corrective repairs are required. Yearly reports are required to be submitted on existing wells with a previously documented vent flow.

 

Copyright © 2008 Progressive Optimization Services. design by digital-blues.com
Download a PDF of this site.
Web Site Hit Counter